Ok so what im reading is that before Bohn was hired, Mick was promised an upgraded locker room on the 2nd floor of the athletic building. However when Bohn was hired and renovations were talked about, they decided to renovate the exiting locker rooms in the arena when all the other renovations were being done.
So thats why Mick was upset about the locker rooms:He was promised something and then they changed the plan.
"That person wants to remain anonymous because the process is still ongoing, but told FOX19 NOW Sports the original locker room renovation project was agreed upon before Mike Bohn started as athletic director. The plan included an expanded and upgraded locker room on the second floor of the athletic building. However, once Bohn began work towards renovating Fifth Third Arena, they decided it was best to renovate the existing locker room already in place when they renovate the building to lump all of the renovation work into one project."
http://www.fox19.com/story/31556647/update-uc-confident-in-cronins-commitment